WATTS
Data sources · compiled 2026-11-11

117 references, each with a source

Figures are approximate and meant for scale, not engineering. “avg” is a continuous average, “rated” the nameplate maximum, “peak” a recorded high, “planned” and “announced” not yet operating. AI campus figures change month to month.

AI and data centres · 43

ReferenceFigureAs ofSource
Nvidia H100 GPU (one chip)
note

Up to 700 W (configurable) for the H100 SXM; the PCIe card is 300-350 W.

700 W rated2023Nvidia, H100 Tensor Core GPU specifications
Nvidia B200 (Blackwell) GPU (one chip)
note

1,000 W in air-cooled HGX B200 servers; 1,200 W in the liquid-cooled GB200 configuration.

1.2 kW rated2025Glenn Lockwood's HPC notes
Nvidia Rubin GPU (one chip, newest shipping generation)
note

About 1.8 kW per GPU package in the Max-Q profile and up to 2.3 kW in Max-P; 2 kW used as the midpoint. Nvidia has not published a single TDP.

2 kW rated2026Hashrate Index, Nvidia Vera Rubin NVL72 specs breakdown
Nvidia DGX H100 server (8 GPUs)
note

10.2 kW maximum for 8 x H100 plus CPUs, memory, fans (six 3.3 kW PSUs, 4+2 redundant). That is about 1.28 kW per GPU at the wall, versus 0.7 kW for the chip alone.

10.2 kW rated2023Nvidia DGX H100 User Guide
Average data centre rack (industry survey)
note

Average rack density 7.8 kW (7.5 kW in 2025), excluding facilities purpose-built above 30 kW; the most common (modal) density passed 11 kW for the first time.

7.8 kW rated2026Uptime Institute Global Data Center Survey 2026, via Data Center Knowledge
Nvidia GB200 NVL72 rack
note

Approximately 120 kW: 72 Blackwell GPUs + 36 Grace CPUs, liquid cooled, eight 33 kW power shelves. Supermicro lists 125-135 kW operating. About 15x a traditional rack.

120 kW rated2025Nvidia DGX GB200 User Guide
Nvidia Vera Rubin NVL72 rack (shipping since Aug 2026)
note

72 Rubin GPUs and 36 Vera CPUs per liquid-cooled rack. Vendors list 190-230 kW of draw (Gigabyte: up to 240 kW per rack); 210 kW used. Up from about 120 kW for a GB200 rack.

210 kW rated2026Gigabyte, AI DLC POD Nvidia Vera Rubin NVL72 (vendor spec)
Nvidia Kyber rack (Rubin Ultra, announced)
note

ANNOUNCED, not shipping: about 600 kW per rack, 800 V DC, target H2 2027 (SemiAnalysis via DCD suggests 2028). The 600 kW figure dates from the GTC 2025 NVL576 design; Nvidia did not restate it for the 2026 redesign.

600 kW rated2027The Register, 5 Jan 2026
One hyperscale AI data-centre building
note

DERIVED from Stargate Abilene: 1.2 GW across eight buildings is 150 MW per building; Oracle's '6 of 8 buildings = 618 MW' is 103 MW each. Epoch puts Meta Prometheus Building 1 at 76 MW IT. Pre-AI hyperscale buildings were typically 30-60 MW (not sourced).

150 MW rated2026Compute Atlas, citing Crusoe and Oracle (derived)
xAI Colossus 1 (Memphis)
note

340 MW IT power (Epoch estimate; about 276k H100-equivalents: H100, H200, B200). Anthropic's May 2026 agreement to take the whole site describes 'more than 300 MW' and over 220,000 GPUs. First 100k H100s were online Sept 2024 at 139 MW. IT load, not facility load; add roughly 20-40% for cooling.

340 MW rated2026-06Epoch AI data-centre directory
xAI Colossus 2 (Memphis / Southaven)
note

946 MW IT power operating (Epoch estimate, snapshot June 2026, still listed Nov 2026); projected 1,531 MW IT by Feb 2027. Other trackers quote 210 MW (first cluster only) to 1.2 GW; Wikipedia cites 440,000 GB300 GPUs in use in Sept 2026. Powered largely by on-site gas turbines; a permanent ~1.2 GW plant was permitted March 2026. Epoch says 80% of its estimates are within a factor of 1.4.

946 MW rated2026-11Epoch AI data-centre directory
OpenAI / Oracle / Crusoe Stargate Abilene
note

618 MW delivered (six of eight buildings) per Oracle on 10 Sept 2026; planned 1.2 GW total (Crusoe). Epoch's Nov 2026 chart shows 824 MW IT; its July estimate was 421 MW IT. Oracle and Crusoe do not say whether their MW are IT or facility. 360.5 MW of on-site gas turbines. A separate 900 MW Microsoft campus is planned next door.

618 MW rated2026-09Compute Atlas, citing Oracle Q1 FY2027 call and Crusoe
Stargate Shackelford County, Texas
note

PLANNED 2.0 GW (Vantage / Oracle); 0 GW operating as of April 2026; Epoch projects completion Q4 2028. Announced capacity, not load.

2 GW planned2026-04Epoch AI, OpenAI Stargate: where the US sites stand
Stargate Dona Ana County, New Mexico
note

PLANNED 2.2 GW (STACK / Oracle); 0 GW operating as of April 2026; Epoch projects completion Q4 2028. Announced capacity, not load.

2.2 GW planned2026-04Epoch AI, OpenAI Stargate: where the US sites stand
Stargate Milam County, Texas
note

PLANNED 1.2 GW (SB Energy / SoftBank); 0 GW operating as of April 2026; Epoch projects completion Q4 2028. Announced capacity, not load.

1.2 GW planned2026-04Epoch AI, OpenAI Stargate: where the US sites stand
Stargate Port Washington, Wisconsin
note

PLANNED 1.3 GW (Vantage / Oracle); 0 GW operating as of April 2026; Epoch projects completion Q4 2028. Announced capacity, not load.

1.3 GW planned2026-04Epoch AI, OpenAI Stargate: where the US sites stand
Stargate Saline Township, Michigan
note

PLANNED 1.4 GW (Related Digital / Oracle); 0 GW operating as of April 2026; Epoch projects completion Q4 2028. Announced capacity, not load.

1.4 GW planned2026-04Epoch AI, OpenAI Stargate: where the US sites stand
OpenAI Stargate, all announced US sites
note

About 9.6 GW planned across seven US sites (Abilene 1.2, Shackelford 2.0, Dona Ana 2.2, Milam 1.2, Port Washington 1.3, Saline 1.4, Lordstown <0.3). Only Abilene is operating.

618 MW rated2026-04Epoch AI, OpenAI Stargate: where the US sites stand
Meta Hyperion (Richland Parish, Louisiana)
note

NOT YET OPERATING (0 MW as of Sept 2026). Epoch projects 1,632 MW IT by Q1 2028 with a 1.8 GW grid load. Meta's own claims: 2 GW initially, scaling to 5 GW; Epoch notes no concrete evidence yet for 5 GW at this site.

1.63 GW planned2026-09Epoch AI data-centre directory
Meta Prometheus (New Albany, Ohio)
note

471 MW IT operating (Aug 2026), a mix of tents, colo and conventional buildings partly fed by on-site gas plants; projected 1,022 MW IT by Q3 2028. Meta describes it as a 1 GW cluster.

471 MW rated2026-08Epoch AI data-centre directory
Microsoft Fairwater Wisconsin (Mount Pleasant)
note

369 MW IT operating (Building 1, operational April 2026); projected 2,263 MW IT by Q2 2028, the largest planned site Epoch tracks. Microsoft has published no MW figure.

369 MW rated2026-05Epoch AI data-centre directory
Microsoft Fairwater Atlanta (Fayetteville, Georgia)
note

636 MW IT operating (Epoch estimate, Nov 2026).

636 MW rated2026-11Epoch AI, Largest AI data centers by power capacity
Anthropic / Amazon Project Rainier (New Carlisle, Indiana)
note

1,037 MW IT operating (Oct 2026, 18 buildings), the largest AI data centre Epoch currently tracks; projected 1,925 MW IT by March 2028. An air permit for Buildings 19-32 implies 2.3 GW total facility power. Runs AWS Trainium chips.

1.04 GW rated2026-10Epoch AI data-centre directory
Google Pryor North (Oklahoma)
note

368 MW IT (Epoch estimate; Building 2 operational Sept 2026). Google's largest AI site in Epoch's list; Columbus and New Albany, Ohio are next.

368 MW rated2026-09Epoch AI data-centre directory
CoreWeave, whole fleet
note

Over 1.7 GW of active power, over 4.6 GW contracted (1.3 GW of it outside the US). Company-reported; basis (IT vs utility) not stated.

1.7 GW rated2026-09-30CoreWeave Q3 2026 results press release (10 Nov 2026)
96 largest AI data centres tracked by Epoch AI
note

15.1 GW IT capacity, 19.6 GW facility capacity across 96 sites worldwide. Capacity, not draw: Epoch says average consumption is typically 60-80% of capacity. Coverage is incomplete, especially under 100 MW.

19.6 GW rated2026-11Epoch AI, AI Data Centers dataset
OpenAI - Nvidia deal
note

ANNOUNCED: at least 10 GW of Nvidia systems; Nvidia to invest up to $100 billion progressively as each GW is deployed; first GW in H2 2026 on Vera Rubin. Letter of intent, not load.

10 GW announced2025-09-22Nvidia press release
OpenAI - AMD deal
note

ANNOUNCED: 6 GW of AMD GPUs; first 1 GW of Instinct MI450 from H2 2026; warrant for up to 160 million AMD shares.

6 GW announced2025-10-06AMD press release
OpenAI - Broadcom deal
note

ANNOUNCED: 10 GW of OpenAI-designed accelerators built and deployed with Broadcom, racks from H2 2026, complete by end of 2029.

10 GW announced2025-10-13OpenAI, OpenAI and Broadcom announce strategic collaboration (13 Oct 2025)
Anthropic - Google - Broadcom TPU deal
note

ANNOUNCED: about 3.5 GW of next-generation TPU capacity for Anthropic from 2027 (Anthropic's own post says 'multiple gigawatts'). Consumption depends on Anthropic's continued commercial success.

3.5 GW announced2026-04-06Broadcom Form 8-K; Anthropic announcement
Anthropic - Amazon compute deal
note

ANNOUNCED: up to 5 GW of new capacity (Trainium2 through Trainium4); nearly 1 GW due by end of 2026; Anthropic commits over $100 billion to AWS over ten years.

5 GW announced2026-04-20Anthropic announcement
All US data centres
note

176 TWh in 2023 = 20 GW average, about 4.4% of US electricity (58 TWh in 2014). Projection for 2028: 325-580 TWh (37-66 GW average), 6.7-12% of US electricity. Excludes cryptocurrency. This is still the latest official US estimate found; 2025-26 actuals are certainly higher (Epoch counts ~15 GW of AI capacity alone, mostly US).

20.1 GW avg2023US DOE / LBNL 2024 United States Data Center Energy Usage Report
All data centres worldwide
note

485 TWh in 2025 (+17% on 2024, implying about 415 TWh in 2024) = 55 GW average, about 1.5% of world electricity. IEA projects about 950 TWh in 2030 (108 GW average, about 3% of world demand). AI-focused data-centre use grew 50% in 2025 and triples by 2030.

55.4 GW avg2025IEA, Key Questions on Energy and AI (April 2026)
Bitcoin network
note

Central estimate about 138 TWh a year (15.8 GW average, about 0.4% of world electricity); the index gives a range of roughly 74-242 TWh.

15.8 GW avg2025Cambridge Bitcoin Electricity Consumption Index (CCAF)
PUE, industry average
note

Industry average PUE 1.54 (2025 survey): 54% overhead on top of IT load. The 2026 survey headline is 1.52.

1.54 ratio (facility power / IT power)2025Uptime Institute Global Data Center Survey 2025, as cited by Google
PUE, best hyperscale (Google fleet)
note

Google fleet-wide trailing-twelve-month PUE 1.09 (Q2 2026 quarterly 1.10). Epoch AI assumes peak PUE of about 1.2 for hyperscalers and 1.4 for others.

1.09 ratio (facility power / IT power)2026-Q2Google Data Centers, Efficiency
GPUs per MW (rule of thumb)
note

DERIVED: 72 GPUs per ~120 kW rack is 600 Blackwell GPUs per MW of IT power, or about 500 per MW of facility power at PUE 1.2 (about 2 kW per GPU all-in). For H100-era air-cooled servers: 8 GPUs per 10.2 kW is about 780 per IT MW. Epoch's Colossus 2 estimate works out to about 1,175 H100-equivalents per IT MW. Rubin-generation racks will be lower in GPUs/MW but far higher in compute/MW.

600 GPUs per MW of IT power (GB200 generation)2025Derived from Nvidia DGX GB200 User Guide
Capital cost of 1 GW of AI data centre
note

Huang: a 1 GW AI factory costs 'roughly $50 billion' to build; Nvidia's content per GW is about $18B (Hopper), $25B (Blackwell), $40B (Vera Rubin). He is selling the hardware. Cross-check: Epoch estimates $35.8B for Colossus 2 at 946 MW IT, about $38B per IT GW.

50,000,000,000 USD per GW2026-09Jensen Huang (Nvidia CEO), as reported by 24/7 Wall St
SpaceX orbital AI data centres, late-2027 goal (planned)
note

PLANNED, NOT OPERATING. SpaceX aims to be adding about 1 GW of AI compute in orbit per year by late 2027, from solar-powered satellites of about 150 kW each built at its Gigasat factory in Bastrop, Texas. A build rate SpaceX is aiming for, not capacity that exists; its IPO prospectus says deployment could begin as early as 2028.

1 GW planned2026Tom's Hardware, SpaceX unveils Gigasat factory (aims for 1 GW/year of space AI compute by late 2027)
SpaceX orbital AI data centres, full-scale goal (planned)
note

PLANNED, NOT OPERATING, and widely doubted. SpaceX's FCC filing for up to one million data-centre satellites says that launching 1 million tonnes of satellites a year at 100 kW of compute per tonne would add 100 GW of AI compute per year. An aspiration stated as arithmetic, with no firm date (Musk has mentioned 2030).

100 GW planned2026-01-30Tom's Hardware, on SpaceX's FCC filing of 30 Jan 2026
Average data centre (Uptime Institute survey)
note

Average commissioned IT capacity of the facilities in the survey is 38 MW, across enterprise, colocation and cloud operators. Capacity, not average draw.

38 MW rated2026Uptime Institute, Global Data Center Survey 2026
Nvidia DGX SuperPOD (8 GB200 racks)
note

DERIVED: one scalable unit of a DGX SuperPOD is 8 GB200 NVL72 racks (576 Blackwell GPUs); at about 120 kW per rack (Nvidia DGX GB200 user guide) that is roughly 1 MW of IT load, before cooling.

960 kW rated2026Nvidia, DGX SuperPOD GB200 reference architecture
Nvidia Blackwell GPU, all-in (one GPU's share of a GB200 rack)
note

DERIVED: a GB200 NVL72 rack draws about 120 kW for 72 GPUs, so each GPU accounts for about 1.67 kW once its share of Grace CPUs, memory, NVLink switches and power conversion is counted. The B200 chip on its own is rated 1.2 kW.

1.67 kW rated2026Nvidia DGX GB200 User Guide (derived)

Everyday · 17

ReferenceFigureAs ofSource
LED light bulb
note

Typical household LED bulb; 60 W-equivalent bulbs draw roughly 7-10 W. ENERGY STAR page opened says LEDs are up to 90% more efficient than incandescent but gives no wattage.

7 W rated2024Wikipedia, Orders of magnitude (power)
Phone charger
note

About 5 W while charging, per EnergySage. Modern fast chargers can briefly draw 20-30 W.

5 W rated2024EnergySage, How many watts do appliances use
Laptop computer
note

EnergySage lists 30-70 W for 'computers'; 50 W used as midpoint. Not a laptop-specific measurement.

50 W rated2024EnergySage, How many watts do appliances use
Human body at rest
note

Metabolic (chemical) power of a resting adult, quoted as equal to a 100 W light bulb. About 2,065 kcal/day.

100 W avg2010Kovac, EMBO Reports (2010), via PubMed Central
Human brain
note

Brain uses about 20% of the body's resting energy: 'a 20 W light bulb burning in our head'. Wikipedia's orders-of-magnitude page gives a 20-40 W range.

20 W avg2010Kovac, EMBO Reports (2010), via PubMed Central
Refrigerator
note

About 650 kWh a year for the average fridge in a US home (75 W around the clock), counting older units. A new ENERGY STAR model uses roughly 350 kWh a year. The compressor draws a few hundred watts but only runs part of the time.

75 W avg2020EIA, Residential Energy Consumption Survey 2020 (end-use estimates)
Microwave oven
note

1.1 kW typical. EnergySage gives 600-1,000 W.

1.1 kW rated2024Wikipedia, Orders of magnitude (power)
Electric kettle
note

Range 1-3 kW. US 120 V kettles are typically about 1.5 kW; UK/EU 230 V kettles reach 3 kW.

1.5 kW rated2024Wikipedia, Orders of magnitude (power)
Hair dryer
note

1,500-2,000 W; US units are capped near 1,875 W by a 15 A circuit.

1.8 kW rated2024EnergySage, How many watts do appliances use
Window air conditioner
note

500-1,400 W depending on size (5,000-18,000 BTU/h per ENERGY STAR sizing table).

1 kW rated2024EnergySage, How many watts do appliances use
Central air conditioner
note

3,000-4,000 W while running. EIA: air conditioning is 19% of US home electricity use (2020).

3.5 kW rated2024EnergySage, How many watts do appliances use
EV charger, Level 1 (120 V outlet)
note

About 1.9 kW; roughly 5 miles of range per hour of charging.

1.9 kW rated2026US DOE Alternative Fuels Data Center
Home EV charger, Level 2
note

Typical residential unit delivers up to 7.2 kW (30 A at 240 V); Level 2 equipment spans 2.9-19.2 kW. About 25 miles of range per hour.

7.2 kW rated2026US DOE Alternative Fuels Data Center
DC fast charger (one stall)
note

DOE: DC fast charging goes up to 500 kW. Most deployed stalls are 150-350 kW.

350 kW rated2026US DOE Alternative Fuels Data Center
Average US home
note

10,791 kWh/yr purchased per residential customer (899 kWh/month). Range: Hawaii 6,178 to Louisiana 14,774 kWh. Purchases understate consumption for rooftop-solar homes. Peak draw of a single home is several times the average.

1.23 kW avg2022EIA FAQ: How much electricity does an American home use?
Average EU home
note

3.6 MWh per dwelling per year EU average; Romania 1.8 MWh to Sweden 8.5 MWh. Reference year not stated on the page (database updated Nov 2025).

411 W avg2023ODYSSEE-MURE, Electricity consumption per dwelling
Tesla Semi Megacharger (one stall)
note

Up to 1.2 MW per stall at Tesla's first public Megacharger site in Bloomington, California; Tesla showed a session peaking at 1,206 kW. Charges a Semi truck's battery to about 70% in 30 minutes.

1.2 MW rated2026electrive, Tesla opens first public 1.2 MW Megacharger for Semi (22 Jul 2026)

Transport and industry · 9

ReferenceFigureAs ofSource
Typical car engine (peak)
note

Peak output range of typical automobiles: 50-250 hp (40-200 kW). 110 kW (about 150 hp) used as a midpoint. Mechanical output, not electrical.

110 kW rated2024Wikipedia, Orders of magnitude (power)
Tesla Model 3 Performance (peak)
note

380 kW (510 hp) total system power, 82.1 kWh battery. Peak output, held only for seconds.

380 kW rated2026EVSpecifications, 2026 Tesla Model 3 Performance AWD
Diesel freight locomotive (GE ES44AC)
note

4,400 hp = 3.3 MW traction rating.

3.3 MW rated2024Wikipedia, GE Evolution Series
High-speed train (TGV Duplex)
note

8,800 kW at 25 kV. Euroduplex 9,400 kW; a 20-car Eurostar e300 has about 12.2 MW available (Wikipedia orders-of-magnitude page).

8.8 MW rated2024Wikipedia, TGV
Boeing 747 at cruise
note

About 140 MW 'average power consumption of a Boeing 747 passenger aircraft'. This is the rate of fuel chemical energy burned, not shaft or thrust power, and is not electricity. No defensible sourced figure was found for the 737; drop or derive from fuel burn if needed.

140 MW avg2024Wikipedia, Orders of magnitude (power)
Largest container-ship engine (Wartsila RTA96-C)
note

14-cylinder version: 80,080 kW (107,390 hp), first used on Emma Maersk.

80.1 MW rated2006Wikipedia, Wartsila-Sulzer RTA96-C
Large aluminium smelter (750 kt/yr)
note

Smelting takes about 14,500 kWh of electricity per tonne of aluminium (IAI world average range 13.5-15 MWh/t). A 750,000 t/yr smelter, the size of the planned Century/EGA Oklahoma plant, therefore runs at about 1.24 GW, around the clock.

1.24 GW avg2026International Aluminium Institute, Primary Aluminium Smelting Power Consumption
Electric arc furnace (300-tonne)
note

A 300-tonne, 300 MVA furnace uses about 132 MWh over about 37 minutes of power-on time, i.e. about 214 MW while melting (derived). A mid-sized furnace has a ~60 MVA transformer. About 440 kWh per tonne of steel.

214 MW avg2024Wikipedia, Electric arc furnace
TSMC, all fabs (company total)
note

About 21,000 GWh in 2022 (nearly double 2017), i.e. about 2.4 GW average. A 2024 figure of 25.55 TWh (about 9% of Taiwan's electricity, ~2.9 GW) appeared in search results only and was not opened. A single leading-edge gigafab is several hundred MW; no sourced per-fab figure found.

2.4 GW avg2022IEEE Spectrum, TSMC's energy demand

Places · 14

ReferenceFigureAs ofSource
US town of 10,000 people
note

DERIVED: 2025 US retail sales of 4,079,909 GWh divided by roughly 340 million people (population not sourced here) is about 12,000 kWh per person per year across all sectors, so 10,000 people average about 13.7 MW. Residential use alone would be about 4.5-5 MW. Peak is typically 1.5-2x average.

13.7 MW avg2025Derived from EIA Electric Power Monthly Table 5.1
New York City (NYISO Zone J)
note

Peak: NYISO forecasts about 11,100 MW for New York City (Zone J) in summer 2026. Annual energy about 50,700 GWh, a 5.8 GW average. Forecasts, not metered actuals.

5.78 GW avg2026NYISO 2026 Gold Book load forecast update (NYSRC ICS, 3 June 2026)
New York State (NYISO)
note

2025 actual load 151,059 GWh (17.2 GW average); 2025 peak 31,405 MW. All-time record 33,956 MW on 19 July 2013.

17.2 GW avg2025NYISO Power Trends 2026
Los Angeles (LADWP)
note

Record instantaneous peak 6,502 MW on 31 Aug 2017; over 8,009 MW of net dependable capacity; about 21 TWh delivered a year (2.4 GW average). LADWP serves the City of Los Angeles, about 4 million people.

2.39 GW avg2021LADWP, Power System Facts & Figures
Texas (ERCOT)
note

All-time peak 91,134 MW on 22 July 2026 (unofficial until settlement), 5.6 GW above the August 2023 record. About 502 TWh in the 12 months to Aug 2026, i.e. 57.3 GW average. ERCOT covers about 90% of Texas load.

57.3 GW avg2026ERCOT, Monthly Operational Overview, July 2026
California (CAISO)
note

All-time record 52,061 MW on 6 Sept 2022. Annual peaks: 48,323 MW (2024), 44,506 MW (21 Aug 2025). CAISO covers about 80% of California. Average load not sourced; roughly 25-26 GW (unverified).

52.1 GW peak2025California ISO Peak Load History
United States, average electric load
note

2025 utility-scale net generation 4,425,029 GWh = 505 GW average. Retail sales to end customers were 4,079,909 GWh = 466 GW average (difference is losses and direct use). Add 93,041 GWh of small-scale solar for total generation.

505 GW avg2025EIA Electric Power Monthly Table 1.1 and Table 5.1
United States, record peak demand (Lower 48)
note

759,180 MW coincident Lower-48 hourly peak on 29 July 2025 (previous record 745,020 MW on 15 July 2024). No higher 2026 figure was found, but summer 2026 set regional records (ERCOT, PJM, SPP) so this may have been exceeded; check EIA's Hourly Grid Monitor.

759 GW peak2025-07-29EIA Today in Energy, 5 Aug 2025
United States, installed generating capacity
note

1,331,109 MW utility-scale net summer capacity at end of August 2026 (includes 80.7 GW storage), plus an estimated 63,193 MW of small-scale solar. Average output: 4,425,029 GWh of utility-scale generation in 2025, about 505 GW.

1.33 TW rated2026-08EIA Electric Power Monthly Table 6.1
China, average electric load
note

Demand 10,573 TWh in 2025, about a third of the world.

1.21 TW avg2025Ember, Global Electricity Review 2026
European Union, average electric load
note

Demand 2,774 TWh in 2025.

317 GW avg2025Ember, Global Electricity Review 2026
World, average electric load
note

Global electricity demand 31,779 TWh in 2025 (+2.8%).

3.63 TW avg2025Ember, Global Electricity Review 2026
World, total primary energy (all fuels)
note

Total energy supply 'exceeded 600 EJ' in 2025 (+1.7%); 600 EJ/yr = 19.0 TW. Secondary report of the EI review; exact figure not given. Wikipedia quotes 20.4 TW for 2022 on a different accounting basis. Includes oil, gas, coal, not just electricity.

19 TW avg2025Energy Institute Statistical Review of World Energy 2026, as reported by DieselNet
Large US hospital
note

DERIVED: about 3,040 large hospital buildings (over 200,000 sq ft, average 644,300 sq ft) used 194 trillion Btu of electricity, about 18.7 GWh each per year, a 2.1 MW average around the clock.

2.13 MW avg2007EIA, Commercial Buildings Energy Consumption Survey: Large Hospitals

Generation · 29

ReferenceFigureAs ofSource
Residential rooftop solar system
note

Median US residential system installed in 2025 was 7.7 kW (DC). Capacity factor is DERIVED from EIA small-scale solar (93,041 GWh in 2025 over ~59 GW at year-end), so slightly understated; roughly 15-20% depending on location.

7.7 kW rated2025LBNL, Distributed Solar & Storage 2026 Data Update (Tracking the Sun)
Utility-scale solar farm (typical new US project)
note

Average new project in 2025 was 127 MWac (7x larger than 2010). Fleet capacity factor 24.0% in 2025 (EIA Table 6.07.B); LBNL range 16-33% by region. A solar farm takes roughly 7-9 acres per MW. EIA AEO lead time: 2 years.

127 MW rated2025LBNL, Utility-Scale Solar 2026 Edition
Largest US solar farm (Gemini, Nevada)
note

Gemini: 690 MW solar paired with 380 MW of batteries, online 2024. LBNL's 2026 edition names Hornet Solar (600 MWac, Texas) as the largest project built in 2025. 'Largest' is contested: Edwards & Sanborn (California) is described as an 875 MW solar-plus-storage facility (ENR) and multi-phase complexes are counted differently.

690 MW rated2024pv magazine (Aug 2026); LBNL Utility-Scale Solar
Onshore wind turbine (average new US)
note

3.4 MW average for turbines installed in 2023; 133.8 m rotor, 103.4 m hub height. Fleet capacity factor 33.8% in 2025 (EIA). Wind farms are spread out but turbines and roads occupy only about 1 acre per MW. EIA AEO lead time: 3 years.

3.4 MW rated2023US DOE / LBNL Land-Based Wind Market Report, 2024 Edition
Largest offshore wind turbine in commercial operation
note

18 MW turbines (292 m rotor) at CGN's 2 GW Fanshi farm, fully operational 24 Sept 2026. A 26 MW Dongfang prototype was installed for testing in 2025 but is not commercial. Offshore capacity factors are typically 40-50% (not sourced here). EIA AEO lead time for offshore wind: 4 years. Average output DERIVED at a typical 40% offshore capacity factor: about 7.2 MW.

18 MW rated2026-09IFLScience, 28 Sept 2026
Aeroderivative gas turbine (GE LM6000)
note

51-57 MW simple cycle, about 40-41% efficiency, 5-minute start. This is the class of unit being trucked in to power AI sites. US simple-cycle gas turbine fleet ran at a 13.6% capacity factor in 2025 (EIA), but behind-the-meter data-centre units run far harder. EIA AEO lead time: 2 years (turbine order backlogs are now much longer). Average output DERIVED from the 13.6% US simple-cycle capacity factor (EIA): about 7.8 MW.

57 MW rated2026GE Vernova, LM6000 product page
Combined-cycle gas plant (2x1 block)
note

A 2x1 power block built after 2015 averages over 700 MW (about 500 MW before 2015); EIA's reference new multi-shaft plant is 1,083 MW. Fleet capacity factor 58.7% in 2025. EIA AEO lead time: 3 years. No credible land-per-GW source found for gas; plant sites are small (tens of acres) excluding wells and pipelines.

700 MW rated2025EIA Today in Energy (Apr 2022) + EIA EPM Table 6.07.A
Coal generating unit (US average)
note

DERIVED: 168,598.5 MW of coal capacity across 448 generators in 2025 is 376 MW per unit; plants usually have 2-4 units. EIA's reference new ultra-supercritical unit is 650 MW with a 4-year lead time. Fleet capacity factor 48.8% in 2025.

376 MW rated2025EIA Electric Power Annual Table 4.3 (derived)
Nuclear reactor (US average)
note

DERIVED: 98,423 MW net summer capacity over 94 operating reactors (March 2026) is 1,047 MW each. Fleet capacity factor 91.1% in 2025. Smallest units about 520 MW (Prairie Island). EIA AEO lead time for a new LWR: 6 years (recent US experience was 10+).

1.05 GW rated2026EIA FAQ (reactor count) + EPM Table 6.1 (capacity), derived
Vogtle Units 3 and 4 (AP1000 pair)
note

Two AP1000s at about 1,117 MW net each (2,234 MW). Construction started 2013; commercial operation July 2023 and April 2024, about 10.4 years each; cost roughly $34-37 billion. The four-unit plant is the largest US nuclear plant: 4,530 MW net summer (EIA).

2.23 GW rated2024Wikipedia, Vogtle Electric Generating Plant; EIA FAQ
EPR reactor (Olkiluoto 3 / Flamanville 3 / Taishan)
note

1,600 MWe net (Olkiluoto 3), 1,630 (Flamanville 3), 1,660 (Taishan). 4,500 MW thermal. Build times: about 9 years in China, about 17 years in Finland and France. Average output DERIVED at the 90% capacity factor typical of nuclear: about 1.44 GW.

1.6 GW rated2024Wikipedia, EPR (nuclear reactor)
NuScale SMR module
note

77 MWe per module (250 MWt); plants of 4, 6 or 12 modules, up to 924 MWe. NRC design-approved but none operating: announced/design figure. EIA AEO assumes 6-year lead time for SMRs. Average output DERIVED at the 95% design capacity factor: about 73 MW.

77 MW rated2026NuScale Power
Palo Verde nuclear plant (Arizona)
note

3 units, 3,937 MW nameplate; 31,322 GWh in 2025 (capacity factor 90.8%, derived). Site about 4,000 acres, i.e. roughly 1,000 acres per GW including buffer.

3.94 GW rated2025Wikipedia, Palo Verde Nuclear Generating Station
Hoover Dam
note

Nameplate about 2,080 MW; about 4 billion kWh per year on average (4.2 billion for 1947-2008), so a capacity factor of roughly 22%. Recent output has been lower with Lake Mead levels.

2.08 GW rated2024US Bureau of Reclamation, Hoover Dam FAQ
Grand Coulee Dam
note

6,809 MW nameplate, largest US power station. 21.17 TWh in 2022 (capacity factor 35%); USBR says 'more than 21 billion kWh each year'.

6.81 GW rated2022Wikipedia, Grand Coulee Dam; USBR FAQ
Three Gorges Dam
note

22,500 MW, the largest power station on Earth (32 x 700 MW + 2 x 50 MW). About 95 TWh in an average year (capacity factor about 48%, derived; infobox says 45%); record 111.8 TWh in 2020.

22.5 GW rated2020Wikipedia, Three Gorges Dam
Largest US grid battery by power (Nova Power Bank)
note

Calpine's Nova Power Bank, Menifee CA: 680 MW / 2,700 MWh (4 hours). By stored energy, Edwards & Sanborn (Kern County) is larger at about 3.3 GWh. Rankings shift quickly. Average output DERIVED assuming one full 4-hour discharge a day: about 113 MW.

680 MW rated2025Engineering News-Record
The Geysers geothermal complex (Calpine)
note

World's largest geothermal complex. Calpine's 13 plants: up to 725 MW net (2024 max 694 MW); 5,471,562 MWh generated in 2024, i.e. 625 MW average. 28,447 acres. US geothermal fleet capacity factor 65.9% in 2025 (EIA). A typical single geothermal plant is about 50 MW (EIA AEO reference size, 4-year lead time).

725 MW rated2024Calpine, The Geysers by the Numbers (2025)
US nuclear fleet
note

94 reactors at 54 plants, 98,423 MW net summer capacity; 785,304 GWh in 2025 (17.7% of utility-scale generation).

98.4 GW rated2025EIA EPM Tables 1.1, 6.1, 6.07.B; EIA FAQ
US solar fleet (utility + rooftop)
note

Capacity at end Aug 2026: 166,677 MW utility PV + 1,392 MW solar thermal + 63,193 MW small-scale = 231 GW (AC). Generation is calendar 2025: 393,343 GWh (297,448 utility PV + 2,855 thermal + 93,041 small-scale). Utility PV capacity factor 24.0%. Ember quotes the US total as 274 GW in DC terms.

231 GW rated2026-08EIA EPM Tables 6.1 and 1.1.A
US wind fleet
note

166,031 MW at end Aug 2026; 461,577 GWh in 2025; capacity factor 33.8%.

166 GW rated2026-08EIA EPM Tables 6.1, 1.1.A, 6.07.B
US natural gas fleet
note

517,190 MW (all gas technologies) at end Aug 2026; 1,811,004 GWh in 2025, 41% of utility-scale generation. Combined-cycle capacity factor 58.7%, simple-cycle 13.6%.

517 GW rated2026-08EIA EPM Tables 6.1 and 1.1
US coal fleet
note

167,274 MW at end Aug 2026; 734,928 GWh in 2025 (up from 652,156 in 2024); capacity factor 48.8%.

167 GW rated2026-08EIA EPM Tables 6.1, 1.1, 6.07.A
US conventional hydro fleet
note

80,046 MW; 241,303 GWh in 2025; capacity factor 34.4%.

80 GW rated2026-08EIA EPM Tables 6.1, 1.1, 6.07.B
US grid battery fleet
note

57,580 MW of batteries at end Aug 2026 (plus 23,063 MW pumped hydro). Batteries shift energy in time; they are not net generators. EIA AEO lead time: 1 year. Average output DERIVED assuming one full 4-hour discharge a day: about 9.6 GW.

57.6 GW rated2026-08EIA EPM Table 6.1
World installed solar capacity
note

About 2.4 TW at end 2025 (2,391 GW per other coverage of the same IRENA report); 511 GW added in 2025. Ember counts 647 GW (DC) added and 2,778 TWh generated in 2025, implying a global average capacity factor of roughly 14-15% on year-average capacity (derived, rough).

2.39 TW rated2025IRENA Renewable Capacity Statistics 2026, via pv magazine
World, all power plants (average output)
note

Every power plant on Earth produced about 31,800 TWh in 2025, a steady 3.6 TW. Generation matches demand: what the world makes, it uses (less a few percent lost in the wires).

3.63 TW avg2025Ember, Global Electricity Review 2026
World installed wind capacity
note

1,299 GW of wind turbines at end 2025 after a record 165 GW added in the year. Wind made 8.5% of world electricity in 2025 per Ember (about 2,700 TWh, derived).

1.3 TW rated2025GWEC, Global Wind Report 2026
World nuclear reactors
note

About 415 operating reactors with 376-377 GW of net capacity. Nuclear made 8.9% of world electricity in 2025 per Ember (about 2,800 TWh, derived).

377 GW rated2025IAEA Power Reactor Information System (PRIS)

Outliers · 5

ReferenceFigureAs ofSource
Lightning bolt
note

Peak power is DERIVED: NWS gives about 300 million volts and 30,000 amps for a typical flash, i.e. about 9 TW (10^13 W) for microseconds. Energy per average negative bolt is about 1 GJ = 278 kWh (Wikipedia; range 0.2-7 GJ), about nine days of an average US home. Huge power, small energy.

9 TW peak2024US National Weather Service (volts, amps); Wikipedia, Lightning (energy)
'1.21 gigawatts' (Back to the Future)
note

Fictional: the flux capacitor needs 1.21 GW, supplied by plutonium or a lightning bolt. Roughly one large nuclear reactor, or the planned Stargate Abilene campus.

1.21 GW peak1985Wikipedia, DeLorean time machine
Saturn V first stage
note

About 166 GW average power of the S-IC first stage (33,000 kN thrust, ~150 s burn). Chemical/jet power, not electricity; figure depends on definition.

166 GW peak1969Wikipedia, Orders of magnitude (power); Saturn V
Sunlight intercepted by Earth
note

1.733 x 10^17 W (about 173,000 TW) at top of atmosphere: 1,361 W/m2 times Earth's cross-section. About 9,000x world primary energy use.

173,000 TW avg2024Wikipedia, Solar constant
A horse (1 horsepower)
note

1 mechanical hp = 745.7 W by definition. A real horse can peak near 15 hp briefly (not sourced).

746 W peak2024Wikipedia, Orders of magnitude (power)

Prices · 13

PriceValueAs ofSource
US average retail price, residential18.16 cents/kWh2026-08EIA Electric Power Monthly Table 5.6.A
US average retail price, commercial14.47 cents/kWh2026-08EIA Electric Power Monthly Table 5.6.A
US average retail price, industrial9.64 cents/kWh2026-08EIA Electric Power Monthly Table 5.6.A
US average retail price, all sectors14.87 cents/kWh2026-08EIA Electric Power Monthly Table 5.6.A
PJM wholesale energy price50.73 $/MWh2025Monitoring Analytics, 2025 State of the Market Report for PJM
ERCOT wholesale energy price (North Hub)37.31 $/MWh2025FERC, 2025 State of the Markets
CAISO wholesale energy price (SP15)28.5 $/MWh2025FERC, 2025 State of the Markets
Solar PPA price, North America (P25 offers)64.23 $/MWh2026-Q3LevelTen Energy PPA Price Index Q3 2026, via Mercom
Wind PPA price, North America (P25 offers)68.27 $/MWh2026-Q3LevelTen Energy PPA Price Index Q3 2026, via Mercom
Wholesale colocation, Northern Virginia (10 MW+)172.5 $/kW-month2026-H1CBRE North America Data Center Trends H1 2026, via Data Center Frontier
Cloud rental, Nvidia H1003.1 $/GPU-hour2026-11-10Ornn Compute Price Index (OCPI-H100)
Cloud rental, Nvidia H2007.24 $/GPU-hour2026-11-10Ornn Compute Price Index (OCPI-H200)
Cloud rental, Nvidia B200 (current flagship in volume)9.9 $/GPU-hour2026-11-10Ornn Compute Price Index (OCPI-B200)